Sewage treatment – Litorale Domitio

Sewage treatment – Litorale Domitio

The whole area of the municipalities of Mondragone and Castelvolturno has been subject, in the recent past, to an intense urbanization developed in the coastal strip between the sea and the highway SS 7 Quater Domitiana. This phenomenon is linked, above all, to the massive presence of tourists that, during the summer season, is represented both by a seasonal population that by commuters who daily flow towards the sea. This results in a highly fluctuating population between winter and summer, due to the high presence, in addition to residents, seasonal and daily tourists resulting increase in water and sanitation needs; these increased requirements also stem from the significant development of new urban areas, with their connecting roads, subsequently acquired assets by municipalities. The whole project is aimed at creating from scratch, a combined sewer, in some areas where the service is lacking, as well as to improve and adapt the system to existing wastewater treatment in the town of Castel Volturno.

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA
Miglioria_imp_dep

Info

Sewage treatment – Litorale Domitio

“Intervention for the improvement and adaptation to the regulations on water treatment plants on the Domitian coast and completion of the water collection system”

Località

Castelvolturno, CE | Mondragone, CE

Importo dei lavori

€4.095.145,71

Indicazione delle categorie

D.04 (VIII), IA.01 (IIIa)

prestazione svolta

Site management | Variation project | Safety design coordination in the execution